Name of the Project : Construction of 630 metre long Gorai Bridge at Kamarkhali, Faridpur including 4.5 KM of Approach Road.
Description of Works Executed : Boring and driving of 72 nos. bored piles (1 metre dia and 31 metre in length – rotary boring machines were used for boring), Casting and driving of 342 nos. pre-cast piles (size 350 mm x 350 mm and length between 14.00 to 17.00 metre) for the bridge (diesel hammers were used for pile driving), Casting and driving of 390 nos. pre-cast piles (size 400 mm x 300 mm and length between 14.00 to 18.00 metre) for the river training works (diesel hammers were used for pile driving), high quality concrete work of 8,000 m3, reinforcement work 2,200 tonne, 4.5 KM road work involving earthworks for sub grade about 4,00,000 cubic metre which were executed by vibro soil compactor, graders and other equipments, sub base and base were compacted by vibro compactors, about 45,000 sqm of bituminous pavement work etc.