Name of the Project : Construction of North South University Campus Project at Bashundhara, Dhaka. (awarded to ABC-MONICO Joint Venture on ABC : 60% – MONICO : 40% basis)
Description of Works Executed : Construction of 3 level of Basement floors (9.8 metre below ground level), Ground + 7 storey Administration Block, Ground + 9 storey Academic Block North, Ground + 9 storey Academic Block South, Students Plaza, Ground + 8 storey Library & Information Centre, Ground + 7 storey Lecture Hall and Open Air Theatre (OAT), Ground + 5 storey Auditorium (capacity 1,200 person), Roads, Landscaping Civil Works, Ancillary Structures for Services. Total floor area of the campus is 1,19,172 square metre (12,82,108 square feet).
Excavation was carried out below 9.8 metre of the ground level with necessary shore piles with bracing to protect the shore piles as well as the earth from deflection. This work was executed by engaging five excavators and twenty two nos. dump trucks to carry the excavated earth to a distance between two to five kilometers.